Case Study

As an output of a 8-week Program Value Assurance assessment provided by NEOS, the client was given a roadmap of tactical and strategic changes that would drive down the cost of an ongoing life/annuity illustrations program. The client engaged NEOS to operate and manage the roadmap, implement the changes, and closely monitor the reduction in the project budget.


Download the Case Study